DRILLING WATER WELL, DEVELOPMENT, PUMP TEST & DE-WATERING

Project Title Location Owner / Consultant Main Contractor Description of Workk
Golden San Water Treat Concession ds 10 Years tment 800 m3 /dayy Al Ghaf Haima fteen – • Al Ser Ghfteen Wa rvices LLC ater ACW Emira LLC WA ates R W RFQ Borehol Well pump Te les Tests, Wa est (Qout Te ater est)
A’ Seeb Wa Project – Al aste Water l Seeb STP Al Seeb • Om Wa S.A man Waster ater Compan A.O.C ny JV of Hyun Rotem f ndai m S – STP Pump sta – Al Seeb ation Q-out ttest
Design for D System for L MPS-2 & M Seeb Dewatering Location MPS-3 at A’ A’ Seebb • Om Wa S.A man Waster ater Compan A.O.C ny Al Ha Engin Co. S assan neering S.A.O.G. P M Pump Test at MPS-3 MPS-2 &
Proposed Bu Chedi’s Staf uilding for ff at Ghubrahh Muscat • Int Co Ho ternational ompanies for otels Go Po Ta’m oint meer DDewatering
The Wave, Muscat Muscat • Th • WS Int Co he Wave Mus S Atkins ternational & o.LLC scat & Saroo Const Co oj truction D L T ad G in Dewatering fo Liner Trial Trial area 20. djacent to se Groundwater n sandy silt f or Waterway 0 m by 20.0 ea lowering 3.0 formation y m 0 m
Pipe line pro Jeffnain ojects – Al A’ Seebb • Om Co man Gas ompany Gulf Petrol Servic leum ces Co. D E 2 w G m 3 Dewatering fo Excavation .0 Km trench wide Groundwater m in silty san .0 months pe or Trench h with 5.0 m lowering 3.5 d formation eriod m 50
The Wave, M (Pump Stati Muscat ion) Muscat • Th • WS Int Co he Wave Mus S Atkins ternational & o.LLC scat & Saroo Const Co. oj truction D S A ad G in 6 Dewatering fo Station– Well Area 50.0 m b djacent to se Groundwater n sandy silt f .0 months pe or Pump lPoint System by 42.0 m ea lowering 9.0 formation eriod m 0 m
Dewatering Janaclies Ar of Shelters a rmy Airport at Egypt • Eggyptian Armyy Contr Orask ract – kom Co. D S 1 G in O Dewatering – System 1 Nr. Of 50. Groundwater n sandy claye One month / s – WellPoint 0 m x 40.0 a lowering 3.0 ey silt shelter area 0 m
Dewatering Station & T Mains of Pump ransmission Hurghad Egypt da, • ERRC Samc Egypt crete t Co D S A ad G in fo Dewatering – System Area 50.0 m b djacent to Re Groundwater n partially ce ormation, 5. – WellPoint by 40.0 m ed sea lowering 9.0 emented sand 0 months pe 0 m d eriod

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.